De León, D., Díaz Camacho, S., & González Pérez, C. A. (1). Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration. Revista Técnica De La Facultad De Ingeniería. Universidad Del Zulia, 36(2). Recuperado a partir de https://mail.produccioncientificaluz.org/index.php/tecnica/article/view/6900