Establishing research methods and systematic approach to the implementation of integrated projects of redeveloping industrial territories
Resumen
This study is aimed to improve and facilitate the first industrial redeployment life cycle stage: planning. The authors claim that in Russia, neither the planning stage, nor the implementation stage are characterized by effective, scientifically-sound systems. To solve this problem, the authors suggest using the integrated interaction information system consisting of many different functional investment, organizational, technological and information subsystems and modules. It is recommended that the main elements of this information system be grouped into four main functional information macroblocks, one of which is developing the design structure, allocating resources, calculating the duration and costs necessary for the project. With the help of analysis of normative and scientific documentation, carrying out research by means of expert assessment, mathematical processing of results and practical application of the obtained results, an algorithm for creating an organizational and technological model of construction and installation works at the industrial reprofiling facility was developed.
Descargas
Citas
Abramov, I. (2018). Formation of Integrated Structural Units Using the Systematic and Integrated Method when Implementing High-Rise Construction Projects. HRC 2017 (HIGH-RISE CONSTRUCTION-2017) E3S Web of Conferences, 33. DOI: 10.1051/e3sconf/20183303075.
Abramov, I., Poznakhirko, T. and A. Sergeev. (2016). The Analysis of the Functionality of Modern Systems, Methods and Scheduling Tools. MATECWebConf 86. DOI: 10.1051/matecconf/20168604063.
Cha, H.-S. and D.G. Lee. (2015). A Case Study of Time/Cost Analysis for Aged-Housing Renovation Using a Pre-made BIM Database Structure. KSCE Journal of Civil Engineering, 19(4), 841-852. DOI: 10.1007/s12205-013-0617-1.
Eddelani, O.; El Idrissi, N. E.; Monni, S. 2019. Territorialized forms of production in Morocco: provisional assessment for an own model in gestation, Insights into Regional Development 1(1): 6-18. https://doi.org/10.9770/ird.2019.1.1(1)
Ghani, L. A., Mahmood, N. Z., Muhammad, Z., Bahri, S., Saputra, J. 2019. The Energy Flow for Maize Production: an Application of Material Flow Analysis (MFA) and Giddens Structural Theory. Journal of Southwest Jiaotong University, 54(4). http://jsju.org/index.php/journal/article/view/319
Hasik, V., Escott, E., Bates, R., Carlisle, S., Faircloth, B. and M. Bilec. (2019). Comparative Whole-Building Life Cycle Assessment of Renovation and New Construction. Building and Environment, 161. DOI: 10.1016/j.buildenv.2019.106218.
Kamar, A., Schultz, C.P.L. and H. Kirkegaard. (2019). Constraint-Based Renovation Design Support through the Renovation Domain Model. Automation in Construction, 102, 45-58. DOI: 10.1016/j.autcon.2019.02.012.
Kim, D. and H.-S. Park. (2006). Innovative Construction Management Method: Assessment of Lean Construction Implementation. KSCE Journal of Civil Engineering, 10(6), 381-388. DOI: 10.1007/BF02823976
Lapidus, A. and I. Abramov. (2018). Formation of Production Structural Units within a Construction Company Using the Systemic Integrated Method when Implementing High-Rise Development Projects. E3S Web of Conferences, 33. DOI: 10.1051/e3sconf/20183303066.
Lapidus, A. and D. Topchiy. (2019). Formation of Methods for Assessing the Effectiveness of Industrial Areas’ Renovation Projects. IOP Conference Series Materials Science and Engineering. DOI: 10.1088/1757-899X/471/2/022034.
Meneyluk, A.I. and L.V. Lobakova. (2016). Methodology for Choosing Effective Models for the Implementation of Buildings Reprofiling Projects. News of the National Technical University "KhPI". Series: Management Strategy, Portfolio Management, Programs and Projects, 1, 76-81. Available from: http://nbuv.gov.ua/UJRN/vntux_ctr_2016_1_17
Newton, S. (2016). The Being of Construction Management Expertise. Construction Management and Economics, 34(7-8). DOI: 10.1080/01446193.2016.1164328.
Pezeshki, Z. and Ivari. (2018). Applications of BIM: A Brief Review and Future Outline. Archives of Computational Methods in Engineering, 25(2), 273-312. DOI: 10.1007/s11831-016-9204-1.
Pukhkal, V.A. and A.B. Mottaeva. (2018). FEM Modeling of External Walls Made of Autoclaved Aerated Concrete Blocks. Magazine of Civil Engineering. Magazine of Civil Engineering, 81(5), 203-212. DOI: 10.18720/MCE.81.20.
Sugiantiningsih, A. A. P., Weni, I. M., Hariyanto, T., Tutuko, P., Sedyowati, L. 2019. Enhancing Environmental Quality through Community Participation based on Traditional Rules: Empowering the New Role of Pecalang in Bali. Journal of Southwest Jiaotong University, 54(5). http://jsju.org/index.php/journal/article/view/365
Topchiy, D.V., Yurgaitis, A.Yu., Kravchuk, A. and D. Shevchuk. (2019). Controlling Methods of Buildings' Energy Performance Characteristics. Topical Problems of Architecture, Civil Engineering and Environmental Economics (TPACEE 2018). E3S Web of Conferences. DOI: 10.1051/e3sconf/20199102026.
Zeibote, Z.; Volkova, T.; Todorov, K. 2019. The impact of globalization on regional development and competitiveness: cases of selected regions, Insights into Regional Development 1(1): 33-47. https://doi.org/10.9770/ird.2019.1.1(3)
Zueva, D.D., Babushkin, E.S., Topchiy, D.V. and A.Yu. Yurgaitis. (2019). Construction Supervision during Capital Construction, Reconstruction and Re-profiling. MATEC Web of Conferences 2019. DOI: 10.1051/matecconf/201926507022.
Copyright
La Revista de la Universidad del Zulia declara que reconoce los derechos de los autores de los trabajos originales que en ella se publican; dichos trabajos son propiedad intelectual de sus autores. Los autores preservan sus derechos de autoría y comparten sin propósitos comerciales, según la licencia adoptada por la revista..
Esta obra está bajo la licencia:
Creative Commons Reconocimiento-NoComercial-CompartirIgual 4.0 Internacional (CC BY-NC-SA 4.0)