Comparative Analysis of Implementation Targets of National Projects in Developed Countries Managing Socio-Economic Indicators in Russia
Resumen
ABSTRACT
The article presents an analysis of the implementation of national projects in development of economically advanced countries, which aim to guarantee the socioeconomic development of the countries in the international aspect. The main components of any national project are configured as a strategic development program. As a result of studying the structure of the objectives, certain successes were revealed that were not planned in their national projects. It is proposed to recommend a review of the planning and implementation approaches of national projects in the Russian Federation in terms of the use of the best practices from other countries.
RESUMEN
El artículo presenta un análisis de la implementación de proyectos nacionales en países desarrollados y económicamente avanzados, que tienen como objetivo garantizar el desarrollo socioeconómico de los países en el aspecto internacional. Los principales componentes de cualquier proyecto nacional de un país se configuran como un programa de desarrollo estratégico. Como resultado del estudio de la estructura de los objetivos, se revelaron ciertos éxitos que no fueron planeados en sus proyectos nacionales. Se propone recomendar la revisión de los enfoques de planificación e implementación de proyectos nacionales en la Federación de Rusia en términos del uso de las mejores prácticas de otros países.
Citas
BRIOL, P. (2008). BPMN, the Business Process Modeling Notation Pocket Handbook. Lulu.com.
CHEN, C. (2003). Mapping Scientific Frontiers: The Quest for Knowledge Visualization. London: Springer-Verlag.
CONSULTATIONS PUBLIQUES. (2020). Consultation du public sur le projet révisé de Programmation pluriannuelle de l’énergie (PPE). Available: http://www.consultations-publiques.developpement-durable.gouv.fr/consultation-du-public-sur-le-projet-revise-de-a2127.html
DEUTSCHLAND.DE. (2017). The challenge “Aufbau Ost”. The reunification process is without historical precedent and a national tour de force that cannnot be completed in a few years. Available: https://www.deutschland.de/en/topic/politics/the-challenge-aufbau-ost
DÍAZ-DÍAZ, R., PÉREZ-GONZÁLEZ, D. (2016). Implementation of social media concepts for e-Government: Case study of a social media tool for value co-creation and citizen participation. Journal of Organizational and End User Computing, 28(3), 104–121.
ECOLOGIQUE-SOLIDAIRE.GOUV.FR. (2020). Programmations pluriannuelles de l’énergie (PPE). Available: https://www.ecologique-solidaire.gouv.fr/programmations-pluriannuelles-lenergie-ppe
GOV.UK. (n.d.). National Infrastructure Delivery Plan, Methods and sources for National Infrastructure Delivery Plan 2010 to 2015, 2016 to 2021. Available: www.gov.uk/government/publications
IFM BONN (based on business registration statistics kept by the Federal Statistical Office). (n.d.). In-house calculation and table. Available: // https://en.ifm-bonn.org/statistics/#accordion=1&tab=1
INSTITUE FOR SECURIRY & DEVELOPMENT POLICY. (2018). Made in China 2025 (MIC 2025). Available: https://isdp.eu/content/uploads/2018/06/Made-in-China-Backgrounder.pdf
IPE REAL ASSETS. (2020). Blackstone hires European infrastructure head from Brookfield. Available: https://realassets.ipe.com/news/blackstone-hires-european-infrastructure-head-from-brookfield/10043891.article
JI, L., LIU, C., HUANG, L., HUANG, G. (2018). The evolution of Resources Conservation and Recycling over the past 30 years: A bibliometric overview. Resources, Conservation and Recycling, 134, 34–43.
KFW. (n.d.). “Aufbau Ost” - Reconstruction of eastern Germany. Available: https://www.kfw.de/KfW-Group/About-KfW/Identit%C3%A4t/Geschichte-der-KfW/KfW-Themen/Aufbau-Ost/
MOTAMEDI, D., MILANI, A.S. (2011). Improving damage resistance of a composite pole using a computer experiment strategy. Proceedings of the ICE – Engineering and Computational Mechanics, 164(3), 171–181.
NATIONAL INFRASTRUCTURE PLAN 2014. (2014). London: HM Treasury. Available: https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/381884/2902895_NationalInfrastructurePlan2014_acc.pdf
REPENNING, N.P., STERMAN, J.D. (2003). Nobody ever gets credit for fixing problems that never happened: creating and sustaining process improvement. California Management Review, 43(4), 64–88.
SERIFI, V., DAŠIĆ, P. (2012). Characteristics of traditional and contemporary models of organizational structures. In: Proceedings of the 7th International Conference ‘Quality, Management, Environment, Education, Engineering’ (ICQME-2012), 19.09.-21.09.2012, Tivat, Montenegro. Montenegro, Podgorica: Faculty of Mechanical Engineering, 333-339.
SINGAPORE'S SMART NATION PROGRAM. (n.d.). Available: https://www.smartnation.gov.sg/why-Smart-Nation/NationalAIStrategy
SMIRNOVA, E. (2018). Control capability of environmental safety in the context of 'green' construction paradigm. Espacios, 39(22), 40.
SUSTAINABLE SINGAPORE BLUEPRINT 2015. (2015). Urban Solutions. Available: https://www.clc.gov.sg/docs/default-source/urban-solutions/urb-sol-iss-7-pdfs/illustration-sustainable-singapore-blueprint.pdf
UPDATED ENERGY-CLIMATE SCENARIO. ADEME 2035-2050. (2018). Available: https://www.ademe.fr/sites/default/files/assets/documents/energy-climate-scenario-ademe-2035-2050-010603.pdf